Wynright Building

The existing modified roof was cleaned and primed before installing Polyflex smooth cap sheet over the 30,000 square foot portion of the roof that was being reroofed. Polyflex was heat-welded and left to weather for 30 days. Once ready, Polybrite 70 elastomeric roof coating was applied to achieve a monolithic, white, reflective surface.