Warehouse/Office Building Project

The warehouse building was flat with an awning in the back displaying a 2:12 pitch. The office section was in the front of the building and the main section of the warehouse had 20-foot open ceilings. It was a large installation that needed to finish on tight deadlines. Novakovich Enterprises, Inc. was up for the challenge.

The contractor installed Polyglass’ Polyflex®, an APP torch down modified bitumen base sheet and Polyflex® G APP granulated cap sheet over the existing membrane. Though not required, the crew covered the cap sheet with an aluminum coating. The coating enhanced the roofing system with extra protection.